Walk the infrastructure.
Tour applicable operating sites and inspect the physical environment, access model, and deployment conditions.
Review / Site tour + operating conditionsDeploy from powered land to a fully commissioned GPU environment across RWS sites in Texas and Washington. Choose how much we build and work with one accountable infrastructure partner from design through production.
Every system is scoped explicitly. Pick your entry point & upgrade any time.
RWS provides the site, building shell, utility power, and fiber. You supply distribution, cooling, racks, networking, and IT.
RWS adds conditioned white space. You supply backup systems, cooling infrastructure, racks, networking, and IT.
RWS adds the cooling plant, backup generation, fuel systems, and meet-me-room infrastructure. You supply racks, networking, and IT.
RWS delivers a racked, cooled, connected, tested, and commissioned environment. You bring the GPU systems and workloads.
Four levels of build on the same footprint. No ambiguity, no surprises at fit-out.
| System | Bare Shell | Pwr Shell | Pwr Shell+ | Turnkey |
|---|---|---|---|---|
| Building shell & structure | RWS | RWS | RWS | RWS |
| Utility power & distribution | RWS | RWS | RWS | RWS |
| Fiber / meet-me rooms | RWS | RWS | RWS | RWS |
| Conditioned white space | Customer | RWS | RWS | RWS |
| N+1 backup generation & fuel | Customer | Customer | RWS | RWS |
| Central cooling plant & capacity | Customer | Customer | RWS | RWS |
| UPS, PDUs & in-rack power | Customer | Customer | RWS | RWS |
| Racks, CDUs, network & commissioning | Customer | Customer | Customer | RWS |
| GPUs / servers & workloads | Customer | Customer | Customer | Customer |
Turnkey = ready for first token: racked, cooled, cabled and commissioned before your GPUs arrive.
100 MW operating and secured, growing to 1 GW by end of 2027.
| Site | Location | Gross MW | Status |
|---|---|---|---|
| East Wenatchee | Central Washington · Mid-C hydro | 6 MW | Operating since 2020 |
| Odessa | West Texas · ERCOT West | 24 MW | Energized · conversion underway |
| George West | South Texas · ERCOT South | 13 MW | Live · modular expansion ready |
| McAllen | Rio Grande Valley · ERCOT South | 10 MW | Live · modular expansion ready |
| Bay City | Texas Gulf Coast | 12 MW | Greenfield · secured |
| Raymondville | South Texas | 6 MW | Greenfield · secured |
| West Wenatchee | Central Washington | 20 MW | Coming online 2027 |
| Additional sites | Texas & Washington | 20–100 MW each | 2026–2027 pipeline |
Factory-built data halls in repeatable 1 MW slices, integrated by RWS on power-ready sites. Factory and site work move in parallel to compress the path to commissioned capacity.
Every commissioned megawatt is available when the environment reaches first token.
Northstar and Fourier platforms give RWS options to match hall design, site conditions, schedule, and deployment requirements.
Site, power, fiber, halls, cooling, racks, integration, and commissioning coordinated through RWS.
Use available RWS-hosted GPU and bare-metal capacity for development and migration while your dedicated infrastructure comes online.
Evaluate operating facilities, technical assumptions, and delivery risk before committing capacity. Qualified prospects can review applicable site, engineering, network, security, and commissioning materials.
Tour applicable operating sites and inspect the physical environment, access model, and deployment conditions.
Review / Site tour + operating conditionsValidate available capacity, electrical design, redundancy, metering, and the proposed delivery path.
Review / Capacity + electrical packageReview carrier availability, fiber paths, cross-connect options, bandwidth, and cluster interconnect requirements.
Review / Carrier + route optionsMatch rack density, cooling, containment, site infrastructure, and modular integration to the hardware plan.
Review / Density + cooling designConfirm access controls, monitoring, remote hands, escalation paths, equipment handling, and change procedures.
Review / Controls + operating proceduresEstablish installation checks, test plans, acceptance criteria, delivery gates, and production handoff.
Review / Test plan + acceptance gatesChoose from operating facilities, expansion-ready campuses, and secured development sites across Texas and Washington. Confirm power, network access, density, cooling, growth capacity, and timing during qualification.
Tell us what you are deploying, how much power and density it requires, and when it needs to be live. We will help identify the right site, delivery model, responsibilities, and path to production.